Quick answer: The first phase of Thane Metro Line 4 runs 10.5 km from Gaimukh to Cadbury Junction along Ghodbunder Road, with 10 elevated stations. Maharashtra Transport Minister Pratap Sarnaik said on 26 October 2026 that it will open in December 2026. MMRDA has not announced a fixed opening date or fares yet, and the rest of the line to Wadala comes later.
For anyone living on Ghodbunder Road, Metro Line 4 has been a construction site outside the window since 2018. It is now close to carrying passengers. Our main office is on Ghodbunder Road in Kasarvadavali, right along the line, and our trucks use this road every day, so we have watched it go up pillar by pillar. This guide covers the stations, the dates, what is confirmed and what is not, and what the metro means if you are planning to move to, from or along Ghodbunder Road in the next few months.
Thane Metro Line 4 at a Glance
| Item | Detail |
|---|---|
| Official name | Mumbai Metro Line 4 (Green Line), with the Line 4A extension |
| Status (14 Nov 2026) | Trial runs on; passenger service not started |
| Full route | Gaimukh to Wadala (Bhakti Park), elevated |
| Length | 32.32 km for Line 4 plus about 2.9 km for Line 4A, roughly 35 km in all |
| Stations | 32 on Lines 4 and 4A together |
| First phase | Gaimukh to Cadbury Junction, 10.5 km, 10 stations |
| Target opening, first phase | December 2026 (stated by the transport minister; MMRDA date awaited) |
| Project cost | ₹15,498 crore (₹14,549 crore for Line 4, ₹949 crore for Line 4A) |
| Trains | 6 coaches at first; platforms built for 8 |
| Depot | Mogharpada, Thane; a pit line at Gaimukh handles trains until it is ready |
| Builder and operator | MMRDA |
Metro Line 4 Phase 1 Stations: Gaimukh to Cadbury Junction
The first stretch covers the whole Ghodbunder Road corridor inside Thane city, from the Gaimukh end near the creek down to Cadbury Junction on the Eastern Express Highway. These are the 10 stations, north to south:
| # | Station | Line | Notes |
|---|---|---|---|
| 1 | Gaimukh | 4A | Northern end; interim pit line for the trains |
| 2 | Gowniwada (Govaniwada) | 4A | New station on the 4A extension |
| 3 | Kasarvadavali | 4 | Original northern terminal of Line 4 |
| 4 | Vijay Garden | 4 | End point of the first trial run in September 2025 |
| 5 | Dongripada | 4 | Planned interchange with the Thane internal ring metro |
| 6 | Tikuji-ni-wadi | 4 | Chitalsar Manpada side |
| 7 | Manpada | 4 | Manpada |
| 8 | Kapurbawdi | 4 | Planned interchange with Metro Line 5 to Bhiwandi and Kalyan |
| 9 | Majiwada | 4 | Majiwada junction |
| 10 | Cadbury Junction | 4 | Southern end of phase 1, on the Eastern Express Highway |
Note what the first phase does not do. It does not reach Thane railway station, Mulund or anywhere in Mumbai. Until the next phase opens, it is a north-south link inside Thane: useful for getting from a tower in Kasarvadavali or Manpada to Majiwada or Cadbury Junction without sitting in Ghodbunder Road traffic, but you will still need a bus, auto or car to reach the local train.
Thane Metro Opening Date: What Is Confirmed and What Is Not
This project has missed several dates. It was first due in 2022, then December 2025, then April 2026. So it helps to separate what has actually happened from what has been promised.
Confirmed milestones
- October 2018: construction of Line 4 begins.
- September 2019: the Line 4A contract (Kasarvadavali to Gaimukh) is awarded.
- 22 September 2025: first trial run, 4.4 km from Gaimukh to Vijay Garden through Gowniwada and Kasarvadavali.
- 2 June 2026: RDSO certification for the Gaimukh to Cadbury Junction stretch, covering rolling stock, track, signalling and safety systems, after about 209 days of testing.
- August 2026: safety certificate issued for six trains for the first phase.
- September 2026: trial runs resume; the Commissioner of Metro Railway Safety (CMRS) inspects the Gaimukh pit line.
Not confirmed yet
- A fixed public opening date. The December 2026 target comes from the state transport minister; MMRDA has said it depends on the final safety approvals.
- Fares. MMRDA has not published a Line 4 fare chart. Its running lines, 2A and 7, charge by distance starting at ₹10, and Line 4 is expected to follow a similar pattern, but treat that as an estimate until the official chart is out.
- Train frequency and operating hours.
- Dates for the later phases, Cadbury Junction to Gandhi Nagar and Gandhi Nagar to Wadala. Planning documents have shown dates between late 2026 and 2027, and none has been fixed.
We will update this page when MMRDA announces the opening date and fares.
What Metro Line 4 Changes for Ghodbunder Road
Ghodbunder Road carries the traffic of a whole new city of towers squeezed into one road, plus the heavy vehicles heading to and from Gujarat and the JNPT side. Here is what the metro will and will not change.
Your daily commute
If you live near a station and work near another, the metro takes Ghodbunder Road’s traffic out of your day. The 10.5 km first phase is the stretch where peak-hour jams are worst. MMRDA’s projections for the whole corridor are large: about 13.43 lakh daily riders by 2031. Most of that depends on the line reaching Mumbai, so the first-phase numbers will be smaller.
Road space after construction
For eight years, metro barricades have taken up the middle of Ghodbunder Road at different points. As each section is finished, barricades come down and lanes open up. Pillars stay, and some U-turns and junction layouts have changed for good, so the road you remember from 2018 is not the road you drive today.
Rents and demand near stations
Property sites have been publishing forecasts about price rises near Line 4 stations for years. We do not sell property and will not guess at numbers. What we can say from our side is simpler: when a metro line opens, families who were waiting for it start moving. Walking distance to a station becomes a common requirement in house-hunting, and moves along the corridor tend to pick up in the months after opening.
Thinking of Moving Closer to a Metro Line 4 Station?
If you are planning a move because of the metro, a few things are worth checking before you sign a lease or a sale agreement.
- Walk the route at peak time. “Near the metro” in a listing can mean a 3-minute walk or a 15-minute walk across a service road with no footpath. Do the walk at 9 AM on a weekday.
- Check which floors face the viaduct. Flats at the same height as the track get train noise and lose some privacy. Higher or lower floors, or the far side of the tower, are quieter.
- Ask about construction still to come. Station entry and exit structures, skywalks and road works can carry on for months after a line opens.
- Look at the second phase. If you commute to Mulund, Bhandup or Ghatkopar, the stations that matter to you are on the next phase, not this one.
- Think about the truck on moving day. Many societies on Ghodbunder Road open onto a service road, and the metro pillars and station stairs can narrow the space where a truck can stand. Ask the society where a moving truck can park before you book the date.
Moving on Ghodbunder Road While Metro Work Is On
The first phase may be close to opening, but work on stations, access roads and the next phases will carry on through 2027. If your move involves Ghodbunder Road in that time, this is how we plan it.
- Timing: Thane traffic police set the hours when heavy vehicles may use Ghodbunder Road, and these rules have changed several times during metro work. We check the current notice before fixing a time slot, so your truck is not held at a checkpoint with the crew waiting.
- Truck size: we pick the vehicle for the narrowest point of the route, not only for the volume of your goods. A society gate under a metro pillar may take a smaller truck where a larger one would block the service road.
- Night or early-morning moves: since we work 24 hours a day, we can run a move early in the morning when the road is clear, if your society allows it.
- A survey at both ends: on the corridor, we check the approach to the new building as well as the old one, because that is where metro works cause surprises.

For moves inside the corridor, see our pages on packers and movers on Ghodbunder Road, Kasarvadavali, Manpada and Majiwada. Each one lists local prices and the details we check for that area.
What Comes After Phase 1
Line 4 is planned to open in stages. After Gaimukh to Cadbury Junction, the next section runs from Cadbury Junction past Thane RTO and Teen Haath Naka into Mulund and Bhandup up to Gandhi Nagar in Kanjurmarg, where it meets the Pink Line (Metro 6). The last section continues through Vikhroli, Ghatkopar and Chembur to Wadala, with interchanges to the Yellow Line (Metro 2B) and the Monorail.
That second phase matters to a lot of Thane families, because Mulund and Bhandup stations will put the LBS Marg side of Mulund within a short ride of Majiwada and Ghodbunder Road. We also run an office in Mulund West, so we will be watching that stretch closely too.
Other Metro Lines Coming to Thane
- Metro Line 5 (Thane to Bhiwandi to Kalyan): under construction, with an interchange planned at Kapurbawdi.
- Thane internal ring metro: a planned loop inside Thane city with 22 stations, with an interchange planned at Dongripada.
- Metro Line 10 (Gaimukh to Mira Road): planned to extend the corridor north across the creek toward Mira-Bhayandar.
None of these have firm opening dates. Line 4 is the first metro line Thane will actually ride.
Frequently Asked Questions
When will Thane Metro Line 4 open?
The first phase, Gaimukh to Cadbury Junction, is targeted for December 2026, according to the state transport minister. MMRDA has not announced a fixed date yet and says the opening depends on final safety approvals.
What are the stations of Metro Line 4 phase 1?
Gaimukh, Gowniwada, Kasarvadavali, Vijay Garden, Dongripada, Tikuji-ni-wadi, Manpada, Kapurbawdi, Majiwada and Cadbury Junction. That is 10 stations over 10.5 km.
Will Metro Line 4 connect to Thane railway station?
Not directly in the first phase. The line runs along Ghodbunder Road and the Eastern Express Highway. Thane station is a few kilometres from Cadbury Junction, so you will need a bus, auto or taxi for that last stretch.
What is the fare of Thane Metro Line 4?
MMRDA has not published the fare chart yet. Its existing lines 2A and 7 start at ₹10 and rise with distance, and Line 4 is expected to follow a similar structure.
Does metro work affect house shifting on Ghodbunder Road?
It can. Heavy-vehicle hours, narrowed service roads and changed U-turns all affect where a truck can stop and when. A mover who knows the corridor will check the current traffic rules and both building approaches before fixing the time.
Planning a Move on the Metro Line 4 Corridor?
Whether you are moving into a new tower near a station or out of Thane altogether, we can plan the move around the road as it is this month, not as it was a year ago. Call or WhatsApp 93224 70950, or fill in the free quote form. Our household shifting prices for Thane start at ₹3,900 for a 1 BHK.
Sources: MMRDA statements reported by the Free Press Journal (22 September 2025, 10 September 2026 and 26 October 2026), and the Line 4 project details published by MMRDA. Checked on 14 November 2026.